Forest Flood Enhancement Works

Koondrook Perricoota – Located Murray River Floodplain Upstream From Barham NSW

Engineering structure and channels to divert flows from Murray River through the forest, in order to mimic natural flooding events.

AUSIPILE was the contractor involved in the installation of permanent cantilevered sheet piling for the construction of the flood gates.

Assessment Package

Have you covered all bases ?