Kauri Apartments

4 Storey Residential – 578 Sherwood Road, Sherwood

Design and construction of perimeter Ø600 Cased Soldier Piles for a 2-level ramping basement.
Construction methodology included pre-drilling through an alluvial cobble bed layer, backfill, and finally casting in-situ piles.
Capping beam details, and temporary bracing struts were designed, supplied and installed by Ausipile.

 

 

Assessment Package

Have you covered all bases ?