Outer Circulating Road – Link Road

Victoria Street, Toowoomba – Sheet Pile Walls and Bridge Piles

Infrastructure project involving drainage channel upgrades and new 3 span 4 lane bridge.

Installation of 656 l.m of permanent sheet pile walls initially pitched and vibro-driven into XW rock using our Bauer RTG19 piling rig, with final driving to set using a crane mounted BSPCX110 hammer.

Installation of 83 x 900 diameter and 76 x 750 diameter soldier piles, and 29 x 1200 diameter bridge piles, temporary and permanently lined.

Assessment Package

Have you covered all bases ?