Bayview St Culvert Diversion

BAYVIEW ST, RUNAWAY BAY

To replace existing stormwater culverts, Gold Coast City Council proposed a new culvert and diversion drain channel which involved excavations of up to 4m depth.

AUSIPILE was involved in the Design & Construction of 60 lineal metres of sheet piling including temporary internal steel bracing to support the excavation and any anticipated groundwater. The sheet piles were driven in dense and indurated sand.

Assessment Package

Have you covered all bases ?