W58 PUMP STATION NERANG
MCKENZIE PARK, NERANG
In 2016, Gold Coast City Council proposed a Sewerage Network Upgrade in the Merrimac West Region with the aim of upgrading the sewerage collection network to cater for future growth and replace ageing infrastructure. The upgrade consisted deep excavation and trenching over a wide area of the Merrimac West Region.
AUSIPILE was involved in the installation of 14 no. of 600mm diameter CFA foundation piles for the proposed W58 Pump Station at Nerang.